1.Location of Industrial Park:
The industrial park is located in Song Lo district, Vinh Phuc Province. From Song Lo district center: 2.5 kilometers to the North, 4 kilometers to the Northeast from Lap Thach Town – Lap Thach district, 5 kilometers from Hanoi – Lao Cai expressway, 5 kilometers from the city center Vinh Yen – Vinh Phuc: 30 kilometers, from Noi Bai international airport: 57 kilometers, from Hanoi city center: 75 kilometers, from Hai Phong port: 180 kilometers.
2. Project scale: 166 hectares
– Industrial land area for lease: 121 hectares
– Industrial land area has completed infrastructure and is ready for lease: 112 hectares.
3. Term of land use: until 2071
4. Industry groups attract investment:
Mechanical industry:
– Manufacturing and assembling cars
– Producing spare parts and components for assembling cars and motorbikes
– Producing precision mechanical components and details
Electronic industry:
– Producing goods for electronic machines installed in cars and motorbikes
– Manufacture of machines for postal and communication equipment
– Producing electronic components, producing consumer electronic products
Electrical equipment industry:
– Producing wire and wire equipment
Building materials:
– High-grade building materials industry
– Plastic packaging, plastic products
Light industry:
– Woven (without dyeing)
– May
– Production of cosmetics
– Footwear (without tanning)
– Processing and preserving vegetables
5. Infrastructure of the Industrial Park:
– The internal road system is reasonably designed to ensure easy and convenient access for vehicles to each plot of land.
+ The central road is 37m wide, the branch road is 24m wide.
+ Lighting system is installed along the roads.
-Power supply is continuously and stably supplied from 110/35/22 KV substation.
– The water plant provides clean water with a capacity of 100,000 m3/day-night to fully meet the clean water demand of all enterprises in the industrial park
– Rainwater and wastewater drainage systems (industrial wastewater and domestic wastewater) are built separately. Rainwater is collected through the sewer system and discharged into rivers in the area. Wastewater is collected to the industrial park’s wastewater treatment plant.
– All industrial wastewater and domestic wastewater must be treated by factories with up to the minimum standards of column B (QCVN 40:2011/BTNMT) before being discharged into the common wastewater drainage system of the industrial park.- The wastewater treatment plant was built with a treatment capacity of: 4,900m3/ day-night.
– Telecommunications cable system with international standards, ready to meet 24-48 lines/ha.Underground fiber optic cable system is directly connected to the fence of enterprises.
– The water supply system and fire hydrants are arranged along the roads of the industrial zone with a maximum distance of 150m between the fire hydrants.
– The system of green trees occupies 10.1% of the area of the whole industrial park. It is a combination of concentrated green trees and trees along the roads in order to create a common landscape for the industrial park.
– Currently: Vinh Phuc Customs Branch is located at Phuc Yen City 40 kilometers from Industrial Park.
– Vinh Phuc ICD Logistic Centeris located at Binh Xuyen distric, Vinh Phuc province 35,9 kilometers from Industrial Park. A design capacity of customs clearance goods is expected to reach 530,000TEU/year located in the ASEAN smart logistics network, dubbed the “super inland port” that integrates the functions of the Distribution Center. and Inland Port to serve the provision of Logistics services for the economic strip of Hanoi – Lao Cai – China and to connect the industrial zones by road and rail as well as to extend to domestic and international seaports. economic.
– Inland port:
+ Neighboring provinces: Hanoi Port, Khuyen Luong Port, Viet Tri Port, Phu Dong Port, ….with a capacity of 500,000 to 2,000,000 tons/year.
+ In Vinh Phuc: Duc Bac Port, Vinh Thinh Port, Nhu Thuy Port… with a capacity of 500,000 tons/year.
– International port:
+ Hai Phong seaport system: Hoang Dieu, Chua Ve, Tan Vu, Dinh Vu, Nam Hai…
+ Hai Phong international gateway port – Lach Huyen port.
+ Cai Lan Port – Quang Ninh
– The system of banks such as: Agribank, Vietinbank, BIDV, … near the industrial park
– Housing areas for workers are being planned and built in urban areas next to industrial parks.
– Vinh Phuc Provincial General Hospital, Vinh Phuc Obstetrics and Pediatrics Hospital, Song Lo Hospital, Lap Thach Hospital and many other hospitals and medical stations will meet the needs of treatment and medical examination and treatment for employees.
– Vinh Phuc province has a system of universities, colleges and professional vocational training schools, which meet the labor demand for industrial parks. There are many universities, colleges, vocational professional schools and a number of other vocational training centers in the province, such as: University of Transport Technology, Hanoi Pedagogical University 2, Vietnam – Germany Vocational Training College, Vocational College of Agricultural Mechanics, ….
– Currently, the number of people of working age in Vinh Phuc province is about 629,770 people in general, and Song Lo district is about 46,998 people in particular. This large workforce will meet the needs of knowledge, unskilled and skilled workers for enterprises. Besides, the labor source from neighboring provinces (Phu Tho, Tuyen Quang, Thai Nguyen) will be a significant additional source for the needs of the industrial park.
– Regional minimum salary: 154,1USD/month
Current popular salary:
Worker: to 227 – 268 USD/month
Office staff, Technicians/ Engineers:to 330 – 495 USD/month
Manager, Chief Accountant, leader: to 495 – 743 USD/month
6. Support incentives when investing in industrial parks in Vinh Phuc province
– Exempt from corporate income tax for the first 2 years, 50% reduction of tax rate for the next 4 years from the time of taxable income generation.
– Exempt from import tax for goods imported for processing for foreign parties; goods imported to create fixed assets; – raw materials and semi-finished products that cannot be produced domestically.
Projects with employees of permanent residence in Vinh Phuc province are supported by the province with training funding from the budget of 1.500.000VNĐ/person for the whole course.
7. About land leasing price
Infrastructure usage fee 95 to 98 USD/m2/1 project life cycle until 2071 (Note: Land leasing price depends on the location and quantity of lease land )
– Land tax paid annually at the State’s unit price (exempt until June 2034)
– Minimum land lease of 5000m2 or more.
– Management fee 0.5 USD/m2/year – paid annually
– Clean water price is 0.643 USD/m3 – paid monthly
– Wastewater treatment price is 0.45 USD/m3 – paid monthly
– Electricity price:
+ Regular hours: 0.070 USD/Kwh
+ Off-peak hours: 0.045 USD/Kwh
+ Peak hour: 0.127 USD/Kwh
Reviews
There are no reviews yet.