1.Location of Industrial Park:
Quang Ninh Industrial Park is located in Quang Yen district with an extremely convenient location in terms of traffic, directly connected to two important expressways: Hanoi – Hai Phong expressway and Hai Phong – Ha Long – Mong Cai expressway.
Location adjacent to the seaport system: Dinh Vu Port system 20,000DWT, Lach Huyen deep water port system 100,000DWT. The system of bulk ports and liquid cargo ports is located in the industrial park. Direct connection to the highway: Hanoi – Hai Phong – Quang Ninh highway extends to the Chinese border. 30 minutes to Cat Bi international airport, 90 minutes to Van Don international airport. European standard underground utility distribution system
2. Project scale: 1193 hectares
3.Term of land use: until 2066, land with one-time lease payment (can be used as mortgage)
4. Industry groups attract investment:
Main industries: Logistics, seaports, petrochemicals, general industry…
5. Infrastructure of the Industrial Park:
Advantage:
– Internal port: In the industrial park, the total land area planned with the function of building a seaport and port services is 467 hectares. The seaport capacity is designed to reach 5,000 DWT, meeting the needs of shipping goods by sea from the industrial park connecting to major seaports in the region and international freight transport.
– Power supply system: capacity: 2×63 MVA, standard supply voltage: 22kV, source: 110kv, green energy capacity: 60 MWP before 2030, European standard underground electricity distribution system.
– Clean water capacity: 20,000 m3/day
– Capacity of wastewater treatment plant: 13,500 m3/day
– The fire protection system is arranged reasonably throughout the industrial park with water pressure of 5-7 bar and water supply capacity of 480 m3/hour.
6. Support incentives when investing in industrial parks in Quang Ninh province:
– The corporate income tax rate is applied at 10% within 15 years.
– Exemption from corporate income tax for 04 years
– 50% reduction in tax payable within the next 9 years
7. About land leasing price
Infrastructure usage fee 125 USD/m2/1 project life cycle until 2066 (Note: Land leasing price depends on the location and quantity of lease land )
– Management fee 0.069 USD/m2/month
– Clean water price According to usage needs
– Wastewater treatment price is 0.9 USD/m3
– Electricity price: According to usage needs.
Reviews
There are no reviews yet.