1.Location of Industrial Park:
Ha Nam Provincial Industrial Park is located adjacent to National Highway 1A, east of Cau Gie – Ninh Binh Expressway, National Highway 38 and North – South Railway.. With a prime location, next to main traffic routes and Right next to the gateway to Hanoi capital,
– Synchronous traffic system, conveniently planned: 70 kilometers from Noi Bai airport, 90 kilometers from Hai Phong port, 12 kilometers from Phu Ly – Ha Nam station; 50 kilometers from Ninh Binh city, 48 kilometers from Pho Noi, Yen My, Hung Yen, 76 kilometers from Bac Ninh city, waterway along Day river…
2. Project scale: 223 hectares
– Industrial land area for lease: 167 hectares.
3.Term of land use: until 2069
4. Industry groups attract investment:
– Manufacturing and processing industry.
– Construction of houses of all types, construction of civil engineering works.
– Transportation and warehouse.
– Agriculture, forestry and fisheries.
– Production and distribution of electricity, gas, hot water, steam, and air conditioning.
– Water supply, waste and wastewater management and treatment activities.
5. Infrastructure of the Industrial Park:
Advantage:
– Convenient location, adjacent to National Highway 1A, east of Cau Gie – Ninh Binh Expressway, National Highway 38 and North – South railway.
– Hanoi’s second airport will be built in Ung Hoa district bordering the province.
– Ring Road 4 passes through 3 provinces of Hanoi, Hung Yen, Bac Ninh and is expected to be completed in 2026. Ring Road 5 passes through Hanoi and 7 provinces of Vinh Phuc, Thai Nguyen, Bac Giang, Hai Duong, Thai Binh , Ha Nam, Hoa Binh.
– National grid system with 220/110/22KV transformer station with capacity of 250 MVA and 110/35/22KV transformer station upgraded to 2x63MVA capacity.
– The main traffic system is a 45m wide double road connecting National Highway 38, internal roads are 20-34m wide.
– Water supply: from the Red River water plant providing capacity of 100,000m2/hour will increase to 300,000m3/hour by 2040.
– Independent centralized wastewater treatment plant with rainwater drainage system with capacity of 5,400m3/day and night
Human resources: abundant with 500,000 people of working age in the province, high quality with 22 vocational training facilities from vocational training centers to universities and colleges, reasonable labor costs, zone minimum wage of 3,640,000VND/person/month (2023 about: 149 USD).
6. Support incentives when investing in industrial parks in Ha Nam province:
– Corporate Income Tax: Tax exemption for 2 years, 50% tax reduction for the next 4 years.
– Land rental exemption during the basic construction period of at least 3 years and maximum 7-15 years depending on the investment field.
– For supporting industries: apply the corporate income tax rate of 10% for 15 years.
– Import-export tax: Tax exemption for materials and goods that create fixed assets of investment projects in preferential areas.
7. About land leasing price
Infrastructure usage fee 120 USD/m2/1 project life cycle until 2069 (Note: Land leasing price depends on the location and quantity of lease land )