1.Location of Industrial Park:
The industrial park located in Chau Duc district, Ba Ria – Vung Tau province has a great advantage in convenient transportation, creating links with provinces and cities as well as major economic centers in the Southeast zone, helping investors. Investment saves a lot of costs and time for transporting goods.
– Synchronous and well-planned traffic system: connecting to National Highway 56, 13 kilometers from National Highway 51, 44 kilometers from Vung Tau city, 75 kilometers from Ho Chi Minh City center. Far from Thi Vai – Cai Mep deep-water seaport cluster: 16 – 19 kilometers. From Long Thanh international airport: 54 kilometers. 71 kilometers from Tan Son Nhat international airport.
2. Project scale: 1556 hectares
– Industrial land area for lease: 1108 hectares.
– Area of leased land: 519 hectares (occupancy rates: 47 %)
– Industrial land area has completed infrastructure and is ready for lease: 100 ha.
3. Term of land use: until 2058
– Land tax paid annually: depends on the location and area of the lease land
4. Industry groups attract investment:
-Electronic components parts, computer and semi-conductors assembling industry;
– Production of cables and materials for telecommunication;
– Production of Pharmaceutical and Medical products
– Precise mechanics, air conditioners and washing machine manufacturers;
– Electrical appliances;
– Car accessories, manufacturing and assembling automobiles;
– Production of new materials and nanotechnologies
– Processing silver and jewelry, gemstones, diamond and other precious metals, etc…;
– Mechanical machining and steel structuring;
– Car, motorbike, bicycle, specialized transport assembling industry;
– Agro-pharmaceutical, agricultural, food, drinks processing, (excluding tapioca processing);
– Construction materials production, construction components (excluding commercial concrete production and concrete structures);
– High grade garment and textile, footwear (excluding dying and tanning process);
– Plastic products, household appliances;
– Wood processing and high-quality wooden furniture, etc…
* Industries that are not welcome and restricted in the Industrial Park:
– Rubber processing;
– Manufacturing basic chemicals (generating industrial wastewater);
– Steel refinery from wasted metal in discontinuous furnace technology;
– Industries that are not priority in the Industrial Park and industries that are not welcome or restricted in the Industrial Park.
5. Infrastructure of the Industrial Park:
– Internal transportation system
+ Asphalted road with 30 tons loading capacity;
+ Center main road North South with 6 lanes, separation 2 meters, width 54 meters;
+ Branch roads with 2 lanes, width 29 meters.
LOADING CAPACITY OF THE GROUND
+ From 1m to 3.5m: 9.31 tons/ sqm
+ From 3.5m to 6.5m : 16.33 tons/ sqm
+ From 6.5m – 12m : 31.68 tons/ sqm
– Electricity distribution system: : Currently there is one transformer station of 110/22 KV with capacity 63 MVA
– Water supply system
+ Pure Water Supply plant has a maximum capacity of 300,000 m3/day
+ Currently, Pure Water Supply plant is running with capacity of 150,000 m³ / day
+ Price according to regulations of province.
– Waste water treatment system
+ Currently wastewater treatment plant is running with capacity of 4,500 m³/day night.
+ Wastewater to be treated: both domestic and industrial wastewater
+ According to the State regulations, the volume of wastewater is calculated by 80% of the supplied water volume.
6. Support incentives when investing in industrial parks in Ba Ria Vung Tau province
– Exemption from corporate income tax for the first 2 years and 50% tax reduction for the next 4 years.
7. About land leasing price
Infrastructure usage fee 105 USD/m2/1 project life cycle until 2058 (Note: Land leasing price depends on the location and quantity of lease land )
– Management fee: 12,500 VND/m2/year (0.5 USD/m2/year)
– Price of clean water Price: according to provincial regulations
– The unit price of electricity for voltage level from 22KV to below 110KV applies as follows:
* Peak time: VND 2,9591/kWh
* Off peak : VND 1,037/kWh
* Normal time: VND 1,604/kWh