• Ba Ria Vung Tau Industrial Park 2

    The North of the Industrial Park is adjacent to Road 365, the South is adjacent to the Phuoc Hoa – Cai Mep planning road, the East is adjacent to the technical corridor of Phu My new urban area and the West is adjacent to Cai Mep Industrial Park.

    Address: Ba Ria - Vung Tau Provice
    Type: Land for lease
    Price: 101-150 USD/m2
    Land Area: > 20ha, 0-5000m2, 10ha-15ha, 1ha - 5ha, 5000m2 - 1ha, 5ha - 10ha
    Posting Date: 16/05/2024
    Category:

    1.Location of Industrial Park:

         The North of the Industrial Park is adjacent to Road 365, the South is adjacent to the Phuoc Hoa – Cai Mep planning road, the East is adjacent to the technical corridor of Phu My new urban area and the West is adjacent to Cai Mep Industrial Park.

    – Synchronous traffic system, conveniently planned: 1.5 kilometers from Highway 51, 30 kilometers from Ho Chi Minh – Long Thanh – Dau Giay Expressway, 1 kilometer from Cai Mep – Thi Vai deep water port, 2 kilometers from general port Phu My, 70 kilometers from Tan Son Nhat International Airport, 35 kilometers from Long Thanh International Airport.

    2. Project scale: 400 hectares

    – Industrial land area for lease: 250 hectares.

    3. Term of land use: until 2058

    4. Industry groups attract investment:

    – Consumer goods manufacturing industry

    – Cosmetic chemical industry, petrochemical production industry

    – Mechanical industry (assembly and repair)

    – Metallurgy, rolling and drawing, post-rolling products

    – Electronics and information technology industry

    – Biotechnology

    – Construction materials industry

    – Production of medical equipment and instruments

    – Medicine production (for humans and livestock)

    – Producing all kinds of fibers, producing plastic beads

    – Producing all kinds of rubber tires and tubes

    – Production of tools, supplies, and stationery equipment

    – Production of electronic equipment

    – CO2 Gas production, liquefaction filling, industrial gas, medical gas, lubricant mixing, storage

    – Mixing and bagging fertilizers

    – Power production

    – Logistics

    – Environmental industry and energy saving

     5. Infrastructure of the Industrial Park:

    Advantage:

    – Strategically located, located next to the Cai Mep deep-water port cluster, convenient for import and export of goods, with a natural gas supply system, located near main roads connecting to Ho Chi Minh City and neighboring provinces , large land fund suitable for large-scale projects.

    – Internal traffic system: internal roads of the industrial park have a width of 15 m to 24 m (road width from 31 m to 63 m)

    – Power supply system: 22KV line is pre-connected to the foot of the factory fence of the land lessees.

    – Clean water supply system: Connected from a water plant with a capacity of 50,000 m3/day and night and pre-connected pipes to the fences of the plots of land.

    – Wastewater treatment system: invested in a centralized wastewater treatment system with phase 1 treatment capacity of 4,000 m3/day and night.

    – Industrial gas supply system: gas supplied from Nam Con Son gas field with large reserves.

    + Reasonable labor costs with minimum wage of region 1

     6. Support incentives when investing in industrial parks in Ba Ria Vung Tau province

    Preferential corporate income tax rate is 17% for 10 consecutive years from the first year the enterprise has revenue from the project. When this preferential tax rate expires, businesses will switch to applying the 20% tax rate.

     – Tax exemption for 2 years and 50% reduction for the next 4 years from the date of taxable income.

    + The tax exemption and reduction period is calculated continuously from the first year the enterprise has taxable income from the project;

    + In case the enterprise has no taxable income in the first three years (from the first year of revenue from the project), the tax exemption and reduction period is calculated from the fourth year.

    – Import tax: Enterprises are exempt from import tax on imported goods according to regulations

    7. About land leasing price

    Infrastructure usage fee 138 USD/m2/1 project life cycle until 2058, price does not include VAT (Note: land rental price depends on location and amount of land leased)

    -Annual land rent: adjusted according to the Decision on land price list of the Provincial People’s Committee.

    – Industrial park management and maintenance fee: 0.65 USD/m2/year and will be adjusted annually.

    – Clean water supply fee: 12,500 VND/m3 (~0.5 USD/m3)

    – Wastewater treatment fee: 0.4 USD/m3

    – Electricity supply price: According to the price schedule prescribed by Dien Luc

    – Internet and television prices: According to investors’ needs

    Land area

    > 20ha, 0-5000m2, 10ha-15ha, 1ha – 5ha, 5000m2 – 1ha, 5ha – 10ha

    Price

    101-150 USD/m2

    Type

    Land for lease

    Reviews

    There are no reviews yet.

    Be the first to review “Ba Ria Vung Tau Industrial Park 2”

    Quick search

    Real Estate information

    Maps