• Ba Ria Vung Tau Industrial Park 1

    The industrial park located in Chau Duc district, Ba Ria – Vung Tau province has a great advantage in convenient transportation, creating links with provinces and cities as well as major economic centers in the Southeast zone, helping investors. Investment saves a lot of costs and time for transporting goods.

    Address: Ba Ria - Vung Tau Province
    Type: Land for lease
    Price: 101-150 USD/m2
    Land Area: > 20ha, 0-5000m2, 10ha-15ha, 15ha - 20ha, 1ha - 5ha, 5000m2 - 1ha, 5ha - 10ha
    Posting Date: 07/05/2024
    Category:

    1.Location of Industrial Park:

         The industrial park located in Chau Duc district, Ba Ria – Vung Tau province has a great advantage in convenient transportation, creating links with provinces and cities as well as major economic centers in the Southeast zone, helping investors. Investment saves a lot of costs and time for transporting goods.

    – Synchronous and well-planned traffic system: connecting to National Highway 56, 13 kilometers from National Highway 51, 44 kilometers from Vung Tau city, 75 kilometers from Ho Chi Minh City center. Far from Thi Vai – Cai Mep deep-water seaport cluster: 16 – 19 kilometers. From Long Thanh international airport: 54 kilometers. 71 kilometers from Tan Son Nhat international airport.

    2. Project scale: 1556 hectares

    – Industrial land area for lease: 1108 hectares.

    – Area of leased land: 519 hectares (occupancy rates: 47 %)

    – Industrial land area has completed infrastructure and is ready for lease: 100 ha.

     3. Term of land use: until 2058

    Land tax paid annually: depends on the location and area of ​​the lease land

    4. Industry groups attract investment:

    -Electronic components parts, computer and semi-conductors assembling industry;

    – Production of cables and materials for telecommunication;

    – Production of Pharmaceutical and Medical products

    – Precise mechanics, air conditioners and washing machine manufacturers;

    – Electrical appliances;

    – Car accessories, manufacturing and assembling automobiles;

    – Production of new materials and nanotechnologies

    – Processing silver and jewelry, gemstones, diamond and other precious metals, etc…;

    – Mechanical machining and steel structuring;

    – Car, motorbike, bicycle, specialized transport assembling industry;

    – Agro-pharmaceutical, agricultural, food, drinks processing, (excluding tapioca processing);

    – Construction materials production, construction components (excluding commercial concrete production and concrete structures);

    – High grade garment and textile, footwear (excluding dying and tanning process);

    – Plastic products, household appliances;

    – Wood processing and high-quality wooden furniture, etc…

    * Industries that are not welcome and restricted in the Industrial Park:

    Rubber processing;

    – Manufacturing basic chemicals (generating industrial wastewater);

    – Steel refinery from wasted metal in discontinuous furnace technology;

    – Industries that are not priority in the Industrial Park and industries that are not welcome or restricted in the Industrial Park.

    5. Infrastructure of the Industrial Park:

    – Internal transportation system

    + Asphalted road with 30 tons loading capacity;

    + Center main road North South with 6 lanes, separation 2 meters, width 54 meters;

    + Branch roads with 2 lanes, width 29 meters.

    LOADING CAPACITY OF THE GROUND

    + From 1m to 3.5m: 9.31 tons/ sqm

    + From 3.5m to 6.5m : 16.33 tons/ sqm

    + From 6.5m – 12m : 31.68 tons/ sqm

    – Electricity distribution system: : Currently there is one transformer station of 110/22 KV with capacity 63 MVA

    – Water supply system

    + Pure Water Supply plant has a maximum capacity of 300,000 m3/day

    + Currently,  Pure  Water  Supply  plant  is  running  with  capacity  of 150,000 m³ / day

    + Price according to regulations of province.

    – Waste water treatment system

    + Currently wastewater treatment plant is running with capacity of 4,500 m³/day night.

    + Wastewater to be treated: both domestic and industrial wastewater

    + According to the State regulations, the volume of wastewater is calculated by 80% of the supplied water volume.

    6. Support incentives when investing in industrial parks in Ba Ria Vung Tau province

    – Exemption from corporate income tax for the first 2 years and 50% tax reduction for the next 4 years.

    7. About land leasing price

    Infrastructure usage fee 105 USD/m2/1 project life cycle until 2058 (Note: Land leasing price depends on the location and quantity of lease land )

    – Management fee: 12,500 VND/m2/year (0.5 USD/m2/year)

    – Price of clean water Price: according to provincial regulations

    – The unit price of electricity  for  voltage  level  from  22KV  to  below  110KV  applies as follows:

    * Peak time: VND 2,9591/kWh

    * Off peak : VND 1,037/kWh

    * Normal time: VND 1,604/kWh

    Land area

    > 20ha, 0-5000m2, 10ha-15ha, 15ha – 20ha, 1ha – 5ha, 5000m2 – 1ha, 5ha – 10ha

    Type

    Land for lease

    Price

    101-150 USD/m2

    Reviews

    There are no reviews yet.

    Be the first to review “Ba Ria Vung Tau Industrial Park 1”

    Quick search

    Real Estate information

    Maps